Non-Destructive Testing Services in Easton, PA
Certified Welding Inspector (CWT) in Easton, PA
Many jobsites ranging from pipelines, fabrication shops, bridges and structural steel fabricators need or require a Certified Welding Inspector (CWI) to help run their quality program, certify welders, perform visual inspections on fit-ups, root passes and final inspections of completed welds. CWIs come from different backgrounds, some have welding experience only, Some have inspection experience only and some have an engineering degree. All CWIs need to know how to interpret the welding procedure, welding qualification, acceptance criteria for defects, welding machines, and consumables. Integrity Testlabs can provide a CWI for your long- or short-term projects.

Easton, PA Magnetic Particle Testing (MT)
Ideal for ferrous material
ASME B31.1 in Easton, PA
Created in the 1930s as a standard code for power piping. ASME B31.1 is a code that provides minimum requirements for safety and guidance for the design of new piping and the repair, modifications and replacement of existing piping. Covering fuel gas and oil systems as well as central and district heating, water and steam systems. ASME B31.1 covers water and steam piping found in all power generation plants throughout the United States. Integrity Testlabs can provided technicians on your next project or outage that have vast experience and knowledge of ASME B31.1 acceptance criteria.

ASNT; American Society for Nondestructive testing
A nonprofit organization which is governed by a board of directors. ASNT publishes and maintains SNT-TC-1A, Standards, Codes of practice, ANSI/ASNT CP-189 and CP-105. They also cover all aspects of qualification and certification of NDT personnel. Integrity Testlabs has a ANST Level III on staff that certifies our Level II and Level I employees so they meet the SNT-TC-1A requirements.


Turnaround or Outage Support
Every year in the Energy and Refinery industry have their planned and or unplanned outages. Typically planned for the spring or fall. The plant will shut down typically for a week to 4 weeks for maintenance. These outages require a number of skilled workers to accomplish the planned work. Typically working around the clock to accomplish this work. These tasks can include replacing equipment, valves, pumps, and piping. They may also overhaul the equipment or overlay the piping or shells to help with corrosion. Integrity Testlabs has the staff to support the needs of the mechanical contractors or the owner operators. We can provide RT, UT, MT, PT and QC/QA support.